ISO Certified Electrical, Mechanical & Civil Engineering Company
DESCRIPTION OF WORK DONE | PERIOD | CLIENT | REMARKS |
---|---|---|---|
Nakifuma Substation Refurbishment and Transformer Upgrade | 2017 | Umeme Limited | All commissioned |
Port bell Substation Upgrade and Refurbishment | 2016 | Umeme Limited | All commissioned |
Ntinda Substation Upgrade and Refurbishment Ntinda Substation transformer upgrade | 2015 | Umeme Limited | All commissioned |
Bombo Substation Switchgear Upgrade | 2015 | Umeme Limited | All commissioned |
Jinja Industrial Substation Upgrade and Refurbishment | 2015 | Umeme Limited | All commissioned |
Jinja Office and Mbale Umeme District office Refurbishment | 2019 | Umeme Limited | All commissioned |
Hoima Umeme District Office Renovation and face lifting | 2017 | Umeme Limited | All commissioned |
Mbarara office renovation and refurbishment | 2017 | Umeme Limited | All commissioned |
Rukungiri office renovation and refurbishment Partitioning works for Ntinda Umeme Office and final Handover for Banda and Ntinda Office | 2017 | Umeme Limited | All commissioned |
Partitioning of now Kireka Office Installation of Lighting and Civil works | 2016 | Umeme Limited | All commissioned |
Conversion and modification of the old mechanical workshop into the Modern CCD of Today | 2016 | Umeme Limited | All commissioned |
Overhead Power Electrical works 33kV Power Line Refurbishment • Britannia 11kV • Mbale – Kumi 33kV • Opuyo – Kumi Serere 33kV • Tororo Rock Town Ring 33kV | 2014 - 2015 | Umeme Limited | All commissioned |
Underground Cable Power works • Queensway line integration project • Green Valley-Nyakana Kamwokya Substation Optic Fibre Installation | 2013 - 2012 | Umeme Limited | All commissioned |
Line Safety Priority Project for Line sections at: • Wankulukuku • Kalagala Nateete | 2013 - 2012 | Umeme Limited | All commissioned |
SCADA Interface wiring for Mityana, Rugombe, Fortportal and Kabale Substations Line Safety Priority Project for Line sections at: - Kitubulu - Kigungu Trading Centre Entebbe | 2012 | Umeme Limited | All commissioned |
Line Safety Priority Project for Line sections at : • Fort portal Boma/ Nyabukara System improvement (Loss reduction) on 33/11 kV lines in Lira town Ring System improvement (Loss reduction) on 33/11 kV lines in Mbale Ring 1 | 2010 - 2011 | Umeme Limited | All commissioned |
Refurbishment of the Metro- Call Centre Park yard and wall fence. | 2005 | Umeme Limited | All commissioned |
Design and construct IT Business Centre at Lugogo | 2006 | Umeme Limited | All commissioned |
Design and construction the Lugogo Transformer Lab including the 5 tone overhead crane for transformer movements. | 2007 | Umeme Limited | All commissioned |
Refurbishment of substation safety and housekeeping project in the following substations. 1. Entebbe substation 2. Kisubi substation 3. Kampala South substation 4. Kampala North substation 5. Namungoona substation 6. Kawanda substation Ntinda substation 7. Kireka substation Lugogo substation 8. Mutundwe substation 9. Queens Way substation 10. Portbell substation 11. Mukono substation 12. Jinja Industrial substation 13. Njeru substation 14. Magamaga substation 15. Iganga substation 16. Kamuli substation 17. FortPortal substation 18. Bombo substation 19. Ggaba substation | 2007 - 2009 | Umeme Limited | All commissioned |
Transportation, installation, commissioning and maintenance of prime and standby Generators ranging from 22 KVA-500 KVA in the following institutions and clubs. (1) Bank of Uganda (2) B.O.U currency centres in all Uganda branches (3) Human Right Commission (4) Uganda National Industrial Research Institute (5) MakerereUniversity (MUK) NARO Kabanyoro (6) Islamic University in Uganda 500 KVA King Fahd Plaza (7) Embassies in Uganda i.e. French, American Embassy, Saudi Embassy | 2004 | CAT Mantrac | All commissioned |
Design and construction of generator houses for generators in seven institutions | 2004 | CAT Mantrac | All commissioned |
Design and fabrication of hot and cold air duct and channel systems for the gensets | 2004 | CAT Mantrac | All commissioned |
Electrical and electro- mechanical works at King Fahd building for construction of rooftop site telecommunication mast equipment | 2008 | Erickson | All commissioned |
Upgrade; Installation and commissioning of 3x 11kV switchgear at Eskom Kira Power Station Dam | 2019 | ABB (U) Limited | All commissioned |
Installation and commissioning assistance of the 5 Generator exciter units at Eskom Nalubaale Power station Dam Provision of Skilled Labour for 15/20MVA Power Transformer | 2018 | ABB (U) Limited | All commissioned |
Installation and Commissioning of GIS Panels in Lira Main 132/33KV Substation | 2017 | ABB (U) Limited | All commissioned |
Installation at Namugongo Substation -Transformer transportation and placement on site plinth -Transformer Mechanical Assembly -MV cable terminations -Control cable terminations -Transformer commissioning -Cable trench construction -Cable tray installation | 2016 | ABB (U) Limited | All commissioned |
Transportation of 33/11kV, 2x10/14 MVA transformers to the site Works to power transformer Installation of 33KV switchgear Cable terminations to 33KV switchgear Installation of 11KV switchgear Cable terminations to 11KV switchgear Installation of station auxiliary transformer Installation of RTU including SCADA interface Installation of power cable Installation of cable ladders Installation of control cables Installation of LV power cable Earthing Installation of steel support structures Installation of AC distribution regulation board Installation of DC distribution regulation board Install 33KV surge arrestors Install 33KV post insulators Installation of power transformer regulation panel | 2008 - 2009 | ABB (U) Limited | All commissioned |
High Voltage power supply and installation works to Arena Mall-Nsambya | 2020 | Chestnut (U) Limited | All commissioned |
33kV power supply and installation works to Hariss International new factory in Tula Kawempe | 2019 - 2020 | Hariss International | All commissioned |
Mbale Substation Reconfiguration-Siiti 2 | 2019 - 2020 | Sagewood Limited | All commissioned |
Smart Meter GoU-ToU Installations | 2016 - 2020 | Umeme Limited | All commissioned |
Siiti 2 Power Evacuation Line construction Lot C and D- 52km | 2019 -2020 | Umeme Limited | All commissioned |
Ntinda Substation Reconfiguration and Switchgear Replacement | 2020 | Umeme Limited | All commissioned |
Kayunga Millers Transformer Injection | 2020 | Umeme Limited | All commissioned |
Tororo Asinget Parish Power Line extension | 2020 | Umeme Limited | All commissioned |
Kapeeka Liao Shen Industrial Park Power line extension | 2020 | Umeme Limited | All commissioned |
Ssanga Transformer Injection | 2020 | Umeme Limited | All commissioned |
Kawanda-Namulonge Loss reduction | 2020 | Umeme Limited | All commissioned |
AMR pre-wired Meter Installation Works | 2020 | GoU ToU | All commissioned |
Underground cable Emergency works rectification | 2018 - 2020 | Umeme Limited | All commissioned |